River Walk Promenade Trail and Levee Access Road

Location of project: Sacramento Riverfront between the Tower and Pioneer Bridges

Estimated Start Date: 2010

Estimated Completion Date: 2011

Brief description of project: 

Construction of 3,250 linear feet of asphalt paved, single-lane roadway for emergency vehicle access, install pole lighting along travel way, install visitor amenities at five connections with east-west pathways into the Bridge District.

Project Manager: John Sneed