McGowan Bridge Water Main Connection and Westfield Village Water Main Project

Location of Project:

This project covers two locations in the City’s north area.  One locations is at the McGowan Bridge (South River Rd/Pioneer Bluffs) and the other is at the Manzanita way and Washington Ave intersection (Westfield Village neighborhood).                                                                          

Estimated Start Date:                                   

Spring 2019

Estimated Completion Date:

Summer 2019

Project Budget:                                                                                                                

$700,000                                                                                                                                             

·         Water Enterprise Funds

Project Description:                                                                                                      

This project includes the installation of about 900 LF of a 16” water transmission main and a 16” control valve to control flow on South River Rd and connection at the McGowan Bridge.  This improvement is needed to accommodate future development-Liberty-Bridge District Tanks. 

 In addition, this project would replace over 15,000 linear feet of existing substandard water mains in the Westfield Village neighborhood.  These improvements have been identified in the 2015 Water Master Plan.

 Project Contact:
Mauricio Meza-Pedraza
Assistant Engineer
Public Works Engineering
MauricioM@cityofwestsacramento.org