HSIP Traffic Safety & Signal Improvement Project

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

STATUS: CONSTRUCTION (COMPLETE)

 

Project Improvement Photos:

PROJECT UPDATES:

Completion Update

The City of West Sacramento has completed its Citywide Safety and Signal Improvement initiative, a federally funded effort supported by the Highway Safety Improvement Program (HSIP). The primary goal was to enhance safety for both vehicles and pedestrians along high-risk streets and intersections. 

This initiative brings targeted upgrades designed to reduce collisions, improve visibility, and enhance pedestrian access at more than twenty locations throughout the community. 

Completed Improvements:

  • Traffic Control (4 locations): Lake Washington Blvd at Southport Pkwy & Westbridge Plaza; Jefferson Blvd at 15th St; Sacramento Ave at Sunset Ave
  • Signal Upgrades (6 locations): Jefferson Blvd at Sacramento Ave & Michigan Blvd; Harbor Blvd at Evergreen Ave, Reed Ave, Riverpoint Ct & Duluth St; Harbor Blvd & Reed Ave; Jefferson Blvd & Michigan Blvd
  • Enhanced Crosswalks (4 locations): Jefferson Blvd at 11th St; C St at 6th St; Sacramento Ave at Solano St & Simon Terrace
  • School Zones & Paths (6 locations): Crossings near Westfield Village and Stonegate Elementary Schools; Bryte Park; Quail-Columbus Path; and surrounding streets

Key Features: LED signal Heads • Raised medians • Refuge islands • School zone beacons • High-visibility striping • ADA curb ramps • Pedestrian Push Buttons 

These combined safety treatments improve visibility, organize traffic movements, and create safer crossings, reducing potential conflicts between vehicles and pedestrians along major corridors. 

Thank you for your patience during this important safety project.

Background

The HSIP Safety and Signal Improvement Project was identified through a Systemic Safety Analysis Report (SSAR) prepared by DKS Associates, in 2018. This report performed a collisions analysis with citywide crash data, identified safety issues on the city's roadway network, and developed a list of systemic low-cost countermeasures to improve safety for all network users. The SSAR identified West Capitol Ave, Jefferson Blvd, Harbor Blvd, and Sacramento Ave as the highest ranked "High Crash Corridors" within the city boundaries.

Focusing on the high priority corridors and using the list of California Local Roadway Safety Manual approved countermeasures, DKS worked closely with City Engineers to finalize the project's scope and locations based on cost and feasibility constraints, competitiveness of Benefit Cost Ratio (BCR) for grant funding, field observations, potential safety benefits, and synergy with current and planned city improvement projects.

Project Description

PROJECT LOCATION

PROJECT DESCRIPTION

Geometric Modification of Approaches at Intersections

  • Lake Washington Blvd @ Southport Pkwy
  • Jefferson Blvd @ 15th St
  • Sacramento Ave @ Sunset Ave
  • Lake Washington Blvd & Westbridge plaza Driveway
  • Installing raised medians on approaches
  • Creating directional medians to prevent left-turns and U-tums.

Treatment at Signalized Intersections

  • Jefferson Blvd @ Sacramento Ave
  • Jefferson Blvd @ Michigan Blvd
  • Harbor Blvd @ Evergreen Ave
  • Harbor Blvd @ Reed Ave
  • Harbor Blvd @ Riverpoint Ct
  • Harbor Blvd @ Duluth St 
  • Improving signal hardware: lenses, back-plates with retroreflective borders, mounting, size, and number
  • Installing flashing beacons as advance warning

Pedestrian Crossing Enhancements at Intersections

  • Jefferson Blvd @ 11th St 
  • C St @ 6th St
  • Sacramento Ave @ Solano St
  • Sacramento Ave @ Simon Terrace
  • Installing raised medians/ refuge islands
  • Installing pedestrian crossing at uncontrolled locations (with enhanced safety features)
  • Curb Extensions/ Bulb Outs

Pedestrian Crossing Enhancements

  • Reuter Dr @ Andrews St 
  • Poplar Ave @ Westfield Village Elementary School
  • Carrie St @ Bryte Park 
  • Quail-Columbus Shared Use Path 
  • Columbus Rd @ Stonegate Elementary School
  • La Jolla St @ Stonegate Elementary School
  • Installing Striping for high visibility crossings and stop bars.
  • Installing RRFBs and signage 
  • Constructing ADA Curbs Ramps and curb extensions

Project Location

Figure 1.1 - Project Site Map 

HSIP Map 1

 - Signalized Intersection Enhancements

 - Pedestrian Crossing Enhancements, Geometric Modification

 

 

Project Benefit

Improvements for this Project are aimed to decrease collisions between vehicles and pedestrians by increasing the spatial awareness for vehicle and pedestrian users with the countermeasures described in the table above. 

Funding

- Highway Safety Improvement Program Cycle 9

Consultants

Central Valley Engineering & Asphalt Inc. - Contractor

Dewberry Engineers Inc. - Construction Management

Kimley Horn & Associates - Design