Status:
The Project is currently at 35% design and is still pending environmental clearance. On January 21, 2026, City Council approved a contract with Bennett Engineering to proceed with 65% design.
Location:
Harbor Blvd from the US 50 On/Off ramp to Industrial Blvd; Industrial Blvd from Harbor Blvd to the Palamidessi Bridge; Lake Washington Blvd from the Palamidessi Bridge to Southport Parkway; Southport Parkway from Lake Washington Blvd to Promenade Street.
Description or Scope:
The Southport to Harbor Roadway Project will not only include road rehabilitation but will also incorporate complete streets elements, including utility upgrades, filling sidewalk gaps, and adding bike lanes to enhance safety and to meet the needs of pedestrians, bicyclists, motorists, and public transportation uses.
Project Benefits:
Complete streets projects are designed to enable safe use and efficient movement and are designed to meet the needs of pedestrians, bicyclists, motorists, and public transportation users. In addition, improving pavement conditions will enhance the safety of drivers.
Tentative Schedule:
| 2026 | 2027 | 2028 | 2029 | 2030 | ||||||||||||||||
| Winter | Spring | Summer | Fall | Winter | Spring | Summer | Fall | Winter | Spring | Summer | Fall | Winter | Spring | Summer | Fall | Winter | Spring | Summer | Fall | |
| 35 % Design | ||||||||||||||||||||
| 65% Design | ||||||||||||||||||||
| Environmental Clearance | ||||||||||||||||||||
| UPRR Coordination | ||||||||||||||||||||
| Community Outreach | ||||||||||||||||||||
| Final Design | ||||||||||||||||||||
| Bidding | ||||||||||||||||||||
| Construction | ||||||||||||||||||||
Cost(s):
Phase 1 Design - $569,600
Phase 2 Design (From 35% to 100% design) – $1.6M
Estimated Construction Costs: (Not currently funded)
-
Harbor Blvd - $2,059,112
-
Industrial Blvd - $6,530,000
-
Lake Washington Blvd - $1,980,000
-
Southport Parkway - $21,980,000
Funding:
Phase 1 Design
Measure G - $1,000,000
SB1 - $500,000
Phase 2 Design
Regional Surface Transportation Grant (RSTP Grant) - $400,000
Enhanced Infrastructure Financing District (EIFD) - $1,200,000
Construction Phase – TBD
Consultant(s):
Design Phase 1: Bennett Engineering Services
Design Phase 2: Bennett Engineering Services
Grant Writing: Dewberry
Additional Resources:
Contact:
Joanna Ortiz
Assistant Engineer
Capital Projects Department
Joannao@cityofwestsacramento.org
Project Boundaries:
Proposed improvements:
Exhibit 1 - Promenade Street to Carlin Drive
Exhibit 2 - Carlin Drive to 1,300' East of Ramco Street
Exhibit 3 -1,300' East of Ramco Street to Lake Washington Boulevard
Exhibit 4 -Lake Washington Boulevard to Stone Boulevard
Exhibit 5 -Stone Boulevard to Terminal Street
Exhibit 6 -Terminal Street to Harbor Boulevard
Exhibit 7 - Industrial Boulevard to Beacon Boulevard
Lasted Edited
8/12/2026