City of West Sacramento
Home MenuEnvironmental Studies
The Southport Sacramento River Early Implementation Project Final Environmental Impact Report Has Been Certified
To comply with the California Environmental Quality Act (“CEQA”), the West Sacramento Area Flood Control Agency (“WSAFCA”) Board of Directors certified the Final EIR; adopted the Findings of Fact, Statement of Overriding Considerations, and Mitigation Monitoring Plan; and approved the Refined Applicant Preferred Alternative for final design and ultimate construction at the August 14, 2014 meeting (See the Minutes Here).
WSAFCA Board of Directors Meeting
10:30 a.m.
August 14, 2014
West Sacramento City Hall
City Council Chambers
1110 West Capitol Avenue
West Sacramento, CA 95691
A full electronic copy of the document is available below (Some of the files are quite large).
Southport Subsequent Environmental Impact Report
- Southport Sacramento River Early Implementation Project Final SEIR
- Findings of Fact and Statement of Overriding Considerations
- Mitigation Monitoring & Reporting Plan
Southport Environmental Impact Report
- Southport EIP Final EIR Volume I Main Document
- Southport EIP Final EIR Volume I Appendix A
- Southport EIP Final EIR Volume I Appendix B
- Southport EIP Final EIR Volume I Appendix C
- Southport EIP Final EIR Volume I Appendix D
- Southport EIP Final EIR Volume I Appendix E
- Southport EIP Final EIR Volume I Appendix F
- Southport EIP Final EIR Volume I Appendix G
- Southport EIP Final EIR Volume I Appendix H
- Southport EIP Final EIR Volume I Appendix I
- Southport EIP Final EIR Volume I Appendix J
- Southport EIP Final EIR Volume II Main Document
- Southport EIP Final EIR Volume II Main Document Appendix A
- Southport EIP Findings of Fact and Statement of Overriding Considerations
- Southport EIP Mitigation Monitoring & Reporting Plan
- Southport EIP Notice of Determination
The Southport Sacramento River Early Implementation Project Draft Environmental Impact Statement/Environmental Impact Report
To comply with both the National Environmental Policy Act (“NEPA”) and the California Environmental Quality Act (“CEQA”), a joint Environmental Impact Statement/Environmental Impact Report (“EIS/EIR”) for the EIP was developed in partnership with the US Army Corps of Engineers. Public Scoping for the EIS/EIR occurred in August and September of 2011. A Draft EIS/EIR addressing the impacts of the EIP was released for public review and comment on November 8, 2013. The public comment period continued until January 6, 2014.
A full electronic copy of the document is available below (Some of the files are quite large).
- Southport EIP Draft EIS/EIR
- Appendix A - Recreation
- Appendix B - Scoping Reports Part 1
- Appendix B - Scoping Reports Part 2
- Appendix C - Geomorph Part 1
- Appendix C - Geomorph Part 2
- Appendix D - Transportation
- Appendix E - Air Quality & Climate
- Appendix F - Vegetation & Wildlife
- Appendix G - Utilities
- Appendix H - Public Health
- Appendix I - Section 106 Draft Programmatic Agreement