Environmental Studies

Print
Press Enter to show all options, press Tab go to next option

The Southport Sacramento River Early Implementation Project Final Environmental Impact Report Has Been Certified

To comply with the California Environmental Quality Act (“CEQA”), the West Sacramento Area Flood Control Agency (“WSAFCA”) Board of Directors certified the Final EIR; adopted the Findings of Fact, Statement of Overriding Considerations, and Mitigation Monitoring Plan; and approved the Refined Applicant Preferred Alternative for final design and ultimate construction at the August 14, 2014 meeting (See the Minutes Here).

WSAFCA Board of Directors Meeting
10:30 a.m.
August 14, 2014
West Sacramento City Hall
City Council Chambers
1110 West Capitol Avenue
West Sacramento, CA 95691

A full electronic copy of the document is available below (Some of the files are quite large). 

Southport Subsequent Environmental Impact Report

Southport Environmental Impact Report

The Southport Sacramento River Early Implementation Project Draft Environmental Impact Statement/Environmental Impact Report

To comply with both the National Environmental Policy Act (“NEPA”) and the California Environmental Quality Act (“CEQA”), a joint Environmental Impact Statement/Environmental Impact Report (“EIS/EIR”) for the EIP was developed in partnership with the US Army Corps of Engineers. Public Scoping for the EIS/EIR occurred in August and September of 2011. A Draft EIS/EIR addressing the impacts of the EIP was released for public review and comment on November 8, 2013. The public comment period continued until January 6, 2014.

A full electronic copy of the document is available below (Some of the files are quite large).

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer