Targeted Traffic Operations and Safety Improvements

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Project Location:

Citywide – individual intersections or isolated locations along roadways

Description:

Stop Sign  Ped SignVertical Bollard

This ongoing program is to analyze, plan, design, and implement small scale targeted traffic operations and transportation safety improvements to address the top issues/requests identified by residents.  These may include:
  • Stop sign warrant analyses
  • Traffic sign updates
  • Minor vehicle, bike, and pedestrian improvements at crossings and intersections using quick-build elements (e.g. vertical bollards)
  • Sight-line improvements, including daylighting at intersections/crosswalks

This program does not include larger scale transportation projects that may be part of a separate Capital Improvement Program (CIP) project, such as the upcoming Neighborhood Transportation Safety and Traffic Calming Program (e.g. speed humps).

Schedule:

Ongoing

Funding:

City Road Fund $150,000 per year

Contact:

Jimmy Fong, TE  
Senior Transportation Engineer
jimmyf@cityofwestsacramento.org

Last Edited: 9/23/2025