Barge Canal Trail Phase I Improvement Project

Print
Press Enter to show all options, press Tab go to next option

START DATE: May 23, 2019

PROJECT DURATION: 65 days

LOCATION: Between the bridge at Lake Washington Boulevard to Jefferson Blvd and connects to Jefferson at two locations: at the intersection of Jefferson and Locks Drive and to the existing western Jefferson sidewalk just south of the Jefferson bridge. 

SCOPE: The Barge Canal trail Project is an exciting project that is part of the larger Pioneer Bluff and Stone Lock Master Plan area.  The project includes construction of a 12 ft  wide asphalt path with two adjacent two-foot aggregate base shoulders; security lighting, seating areas with standard street furnishings, such as, benches and above ground trash receptacles and incorporates found artifacts from the Stone Locks Facility’s outbuildings as aesthetics treatments. Additionally, there will be removal of an existing sidewalk ramp at Jefferson and Locks Drive, construction of a new sidewalk ramp, reconstruction of sidewalk, and pavement striping are also included. 

Contact
Inambao, Lifanu 
Project Manager II
(916) 617-4803
inambaol@cityofwestsacramento.org