Mike McGowan Bridge and Village Parkway Extension

Press Enter to show all options, press Tab go to next option

South River Road Bridge and Village Parkway Extension

Mike McGowan Bridge and Village Parkway ExtensionLocation of Project:

South River Road across the Barge Canal, east of the Stone Lock structure; approaches to the Bridge extend from 15th Street on the north to a connection with Village Parkway on the south.

Estimated Start Date:

Dependent on funding.

Estimated Completion Date:

24 months after start.

Village Parkway Initial Study and Mitigated Negative Declaration:

Brief Description of Project:

We are currently in construction phase. This project includes a new four-lane bridge over the Barge Canal, approximately 525 feet in length; extension of the four lane Village Parkway from the present northerly terminus to the proposed bridge; and widening South River Road to three lanes north of the Barge Canal to the US50/Business 80 off-ramp. Additionally, the project will include turn lanes, median islands, bike lanes, traffic signals, curb, gutter, sidewalk, storm drainage, water main and landscaping. This project will also accommodate the installation of a future streetcar.


To improve traffic safety and to alleviate traffic congestion on Jefferson Boulevard.


Jay Davidson, Project Manager
(916) 617-4658

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer